    New Delayed CAC Statuses
    New delayed CAC status codes were added to this release. The CAC statuses were added to both the workbenches CAC functions and the EE role-based CAC browse collections.
    The system retrieves production order component detail records when CAC is enabled through user preferences in the Planning and Scheduling Workbenches Preferences window. The system calculates CAC statuses when it returns data from your initial search for records and displays the production order component status of each production order retrieved. Results are shown in the Component Status column within the Sequence Grid. New statuses that display include:
    Authorized receipts delayed
    The production order item is covered by authorized receipts but the authorized receipts have a due date in the past.
    Scheduled receipts delayed
    The production order item is covered by scheduled receipts but the scheduled receipts have a due date in the past.
    Pull-Down Windows Added to Fields
    The following fields within Production Order Maintenance Details tab in the workbenches now have pull-down windows that let you select the field entry:
    Scheduled Line
    Order Type
    Fixes
    The Planning and Scheduling Workbenches maintenance release for 2010.1 EE fixes the following defects:
     
    Internal Defect-Tracking Number
    Description
    QPS-1313
    The Planning and Scheduling Workbenches now work properly with different cultures/locales. Previously, a PC Locale of German resulted in a breakage due to a change in the format of a string date.
    QPS-1555
    Text within the MSW order comments now wraps correctly to the next line when you display comments.
    QPS-1556
    The MSW now correctly displays Item-Site Planning (1.4.17), not Item Data Master (1.4.1), information on the shortage report when item-site data exist. Since each site may have completely different item-site planning data set up for an item, item-site data now correctly takes precedence over item master data.
    QPS-1557
    The Scrap Transaction (18.22.18) now correctly applies the scrap quantity to scheduled production orders.
    QPS-1558
    The system now correctly saves the value of the Lot Number field in the Compliance Tab of the Planning and Scheduling Workbenches for production orders.
    QPS-1559
    The component availability check (CAC) process now correctly merges updated data when you sequence production orders that display in the PSW for a production line, then save your changes. Previously, the CAC merge process started, then did not complete, causing an error message to display.
    QPS-1560
    The system no longer displays incorrect errors and warnings in the Planning and Scheduling Workbenches when you:
    Disable Compliance in Compliance Control (1.22.24).
    Create a new production order in the Production Order Maintenance panel.
    Enable the Active field in the Production Order Maintenance Compliance tab.
    Save the newly created production order.
    Previously, with this scenario, the system displayed an incorrect message regarding the active state of compliance. Then, after you saved the production order, the workbenches regarded the order as new, even though it actually saved the order.
    QPS-1575
    The workbenches no longer display a message, informing you that it was unable to cast from DBNull to string after you created a succession of new production orders for various items and/or production lines.
    QPS-1579
    New selection fields to include P(lanned), F(irm) Planned, E(xploded), A(llocated), and/or R(eleased) production orders were added to the reports and inquiries of the Capacity Requirements Planning (24) menu. Since the workbenches generate capacity loads for planned orders, planned order load was being included in the capacity load reports and inquiries. The new fields let you include or exclude load for orders of any status from the capacity load reports and inquiries.
    QPS-1580
    Material availability check functions within the CAC portions of the workbenches now display the component status for global phantom items with an E(xploded) status. Previously, QAD EE repetitive functions displayed the status of global phantom components with a repetitive E(xploded) status, but the workbench CAC functions did not. The workbenches are now synchronized with this functionality.
    QPS-1583
    CAC performance was improved through a change wherein the CAC horizon now correctly defines the production order records that the CAC engine processes. For example, when you set the CAC horizon to seven days, the CAC engine processes only production orders with release dates less than or equal to today + seven. Now that the system correctly applies the CAC horizon preference setting, the number of work orders processed by CAC is reduced, thereby, increasing CAC processing time. Previously, the CAC horizon was ignored by the backend processing of production order records so that the CAC horizon preference setting was not being fully applied to reduce the number of work orders processed by CAC. Also, the default CAC horizon was changed from 30 to seven days.
    QPS-1586
    Problems caused by relational data integrity were corrected so that the workbenches no longer display a message, informing you of unsaved changes, when you enter a number in a Schedule Grid cell, then click Tab to get out of the cell, save, then re-search for records. Previously, the number you entered in the cell, using the above scenario, vanished, even though the system created an entry in the Production Order Maintenance panel. And, once you saved, then re-searched for records, the system displayed a message, informing you of unsaved changes.
    QPS-1588
    Data retrieval work order master and detail performance was improved through internal code changes.
    QPS-1590
    The QAD EE Advanced Repetitive Picklist Calculation (18.22.3.1) no longer calculates an incorrect quantity if you split an order in the workbenches.
    QPS-1591
    When you enter data and select Next in the Production Line Maintenance (18.22.1.1) Item frame, the system no longer exits without saving. Previously, when you maintained or added a production line in the program, the system exited, saved the header data, did not save item data, and did not display an error or message.
    QPS-1598
    SSM and PRM production orders with a non-blank FSM Type other than RMA no longer cause the MSW search to return an error, stating that the system was unable to process the request.
    QPS-1602
    In the PSW Sequence Grid, the system no longer returns a data error when you unassign a previously assigned shift to a production order.
    QPS-1603
    The workbenches no longer lock when you move a production order from the source to a destination production line; for example, when you move a production order from production line A to production line B. This typically occurred when only one production order record existed for the item.
    Finding User Documentation
    You can find documentation for this release of the Planning and Scheduling Workbenches by searching for the product by name under the Enterprise Edition (EE) menu of Documentation on:
    You can register for a QAD Web account by accessing the Web site and clicking the Accounts link at the top of the screen. Your customer ID number is required. Access to certain areas is dependent on the type of agreement you have with QAD. The support site includes documents that support this 3.3.3.1 maintenance release of the workbenches.
    The following documents are on the support site listed above. You select:
    Documentation
    QAD Enterprise Edition
    Then, use the following table to find the correct category.

    Supporting Documents
     
    Title
    Information
    URL
    Release Notes (this document): Planning and Scheduling Workbenches, for 2010.1 through 2012.1 EE March 2013
    Enhancements and release information
    qad.com | Support | Document Library | QAD Enterprise Edition | QAD Version Number |Release Notes
    Where Version Number is 2012.1, 2012, 2011, 2011.1 or 2010.1
     
    Administration Guide: Planning and Scheduling Workbenches
    Technical product information
     
    qad.com | Support | Document Library | QAD Enterprise Edition | QAD 2013 |User Guides
    User Guide: Planning and Scheduling Workbenches
    Instructions on navigating and using the workbenches
     
    qad.com | Support | Document Library | QAD Enterprise Edition | QAD 2013 |User Guides
    Training Guide: Planning and Scheduling Workbenches
     
    Training documentation
    qad.com | Support | Document Library | QAD Enterprise Edition | QAD 2013 Training Guides
     
    Installation Guide: Planning and Scheduling Workbenches for EE 2010.1 through 2013 for version 3.3.3.22.
    Installation instructions
     
    qad.com | Support | Document Library | QAD Enterprise Edition | QAD Version | Installation Guides
    Where Version Number is 2012.1, 2012, 2011, 2011.1 or 2010.1
     
     



      |  
    Next Page