Overview of QAD Data Warehouse Designer > Scheduler
  
Scheduler
The flow of data from the source systems to data warehouse tables is controlled and managed by the QAD Data Warehouse Designer scheduler. All generated code includes audit and error logging logic that is used by the scheduler.
The scheduler provides a single point of control for the warehouse. From the scheduler the state of all jobs can be ascertained. Any warning or error messages can be investigated, and should a problem occur the scheduler controls the restart of the job from the point of failure.