Copy Cost Set
Use Cost Set Copy to Cost Set (30.3) to base new cost set on existing cost set.
Copy Cost Set as Baseline
The costs for a planning cost set are usually added by copying an existing cost set as a baseline and then adjusting the costs. Use Cost Set Copy to Cost Set (30.3). Or you could copy a cost set into a simulated cost set, modify it, and then copy the accepted simulation as your baseline.