Roll Up Routing Costs
Routing Cost Roll-Up (14.13.13) is used to calculate the costs for items based on their routing (process) operations. The roll-up uses data defined in:
• Item Master Maintenance (1.4.1)
• Routing Maintenance (14.13.1)
• Work Center Maintenance (14.5)