Set Up WLT > Additional Setup > Exercise: Set Up WIP Lot Trace
  PPT
Exercise: Set Up WIP Lot Trace
QMI produces medical ultrasound equipment at site 10-100 and wants to perform WIP lot trace on the 10MHz probe assembly (50001) and its subcomponents throughout the production process.
1 Use Product Structure by Item Report (13.8.1) to view the product structures of item 01010 and item 50001.
2 Use Routing Inquiry (14.13.3) to view routing U-001 and routing P-001 for medical ultrasound (01010) and 10MHz probe assembly (50001) respectively.
3 Use WIP Lot Trace Control (3.22.13.24) to configure global settings for WIP Lot Trace. Since we do not want to trace all parent and component items, set Trace Parents and Trace Components to No.
 
Field
Data
Enable WIP Lot Trace
Yes
Trace Parents
No
Split WIP Lots
Yes
Combine WIP Lots
Yes
WIP Lot Overissue
Yes
Trace Components
No
Trace Reference
Yes
Combine Component Lots
Yes
4 Use Routing Registration Maintenance (3.22.13.1) to set up WIP lot trace for routing P-001. Set Trace Parents to Yes.
5 Use BOM Registration Maintenance (3.22.13.4) to set up WIP lot trace for BOM code 50001. Set Trace Components to Yes.