Cross-Docking - Cross-Dock Setup
1 Modify Sequence 20 of the receiving internal routing to check for a shortage (clear shortages).
2 Create an internal routing from receiving to packaging.
3 Assign the SHRT-SO transaction type to the new internal routing.
4 Assign SC algorithm type 2 to the RCT-* transaction type.
5 Assign PK algorithm type 1 to SHRT-* transaction type.
6 Assign LF algorithm type 3, 1 to transaction type SHRT-SO.
7 Modify the PICK-SO transaction type.