Inspection > Inspection Product Flow
  PPT
Inspection Product Flow
When product is received, QAD Warehousing supports the product movement from receiving into inspection and on to disposition or storage. Flexible parameters can be setup to determine when product is inspected.
What is inspected?
When is it inspected?
How much is inspected?
What is the inventory status during inspection?
What happens to the load during inspection?
Is inspection destructive?
What happens to failed inspections?
Did You Know
Quality algorithms start at receiving.
Inspection tags can be printed based on receipt frequency, a previous bad inspection, and a required inspection on the order.