New Product Flows = New Routings
With the addition of an inspection process and area, you need to develop two new potential routings to represent the new product flows:
• One from receiving to inspection (PO Inspect in the graphic above).
• Another from inspection to storage (Back PO in graphic above).
You can also develop a routing from the inspection to QA Hold Area, but for now, you can focus on a pass inspection result.