Inspection > Confirm Check Inspection to Trigger QA Rules
  PPT
Confirm Check Inspection to Trigger QA Rules
Going back to the initial receipt to put-away routing developed during receiving or warehouse setup, check the Check Inspection field in the last frame of the Sequence 20 in Internal Routing Maintenance. This triggers the QA rules upon receipt and routes the load, or part of the load, to inspection as needed.
Note: Enabling the Check Inspection field in Sequence 10 does not trigger the QA rules; however, if you have additional sequences, 10, 20, 30, and so on, the system does look at all additional sequences. Generally, sequence 10, which is the product receipt, or first step, does not get assigned an inspection step, it is the subsequent step after receiving.