Reviewing Production Labor Hours
Production Labor Inquiry (33.15.11) shows projected labor hours required to execute scheduled line production. This inquiry calculates total site labor hours based on the run crew size specified in Production Line Maintenance (18.1.1).
Note: The enhanced Production Labor Report (33.15.35) is also available in .NET UI.