Process Work Order Component Issues
The Periodic Costing value for WO issue components is from the Periodic Costing calculated unit cost for the component. The system summarizes these WIP calculations by WO lot, WO operation, and WO component issue location. The PCISSWOT transaction stores the summarized Periodic Costing calculated component costs. When only one transaction history record exists for the WO lot, WO operation, or WO issue location, then the system does not summarize costs. The summarized PCISSWOT transaction history record stores both the reversed standard costs and the newly calculated Periodic Costing component costs. The system stores the WIP values as cost for the work order.
On occasion, you may need to adjust the cost calculated for a WO, operation, and component. You do this using WO Component Cost Adjustment (30.5.5.13) and the system stores the adjustment value as the PCWO-ADJ transaction history type. The valid cost elements for this function are labor, burden, overhead, and subcontracting. The system processes these additional costs during this calculation and stores them on the work order WIP period balance. They are not included in the summarized PCISSWOT transaction.