Set Up Line Charges
Setting up the line charge functions is similar to setting up the container charge functions. It involves the following tasks:
• (Optionally) Design and code custom Progress line charge and validation programs.
• (Optionally) Create line charge type codes.
• Set up trailer codes for use with line charges.
• Activate line charges in the control program and define system-wide control settings.
• (Optionally) Create ship-to control records to override control program line charge settings.
Line Charges Setup Work Flow shows a typical line charge setup work flow. Some environments do not require every setup step. For example, in some environments the control program settings apply throughout the system to all ship-to addresses. In other environments, control program settings need to be changed for specific ship-to addresses. In these environments, additional setup steps are required to create ship-to control records to override the control program line charge settings.