QAD 2017 Enterprise Edition > User Guides > Lean Manufacturing > Using Kanban Workbenches > Workbench Data > Process Detail Data
  
Process Detail Data

Process Detail Data Fields
 
Field
Description
Item
Display only. This field displays the identifier for a kanban item.
Step
Display only. If a process step is defined for this item in Kanban Master Maintenance, it displays here.
Process UM
Display only. The system displays the item unit of measure specified in Item Master Maintenance. If this is not the same as the pitch UM defined in Kanban Process Maintenance, the system displays the conversion factor.
Minimum Item EPEI (Current and Revised)
The system displays the minimum item EPEI specified for the loop in Kanban Master Maintenance. When EPEI Automatic (Revised) is Yes, the system sets the item EPEI (Revised) to either the value of the EPEI (Revised) field in the process data frame or Minimum Item EPEI (Revised), whichever is greater. If you update Minimum Item EPEI (Revised) and save your changes, the system updates the corresponding value in Kanban Master Maintenance.
EPEI (Current and Revised)
When EPEI Automatic (Revised) is Yes, the system displays the calculated process EPEI. When it is No, the system displays the reference value entered for the item in Kanban Process Maintenance. Based on whether you change the value of EPEI Automatic (Revised), you can either update the manual entry here or have the system automatically update the field based on the process EPEI.
EPEI Automatic (Current and Revised)
The system displays the EPEI Automatic setting specified for the item in Kanban Master Maintenance. This setting determines whether the system uses information for this item when calculating process EPEI. When it is No, the setup time is fixed and is removed from the calculation of the time available for changeover during EPEI calculation. You can enter EPEI manually as a reference value. If you change it, the system updates the process EPEI, either including or excluding the item based on the new setting. Additionally, the system updates the Kanban Master Maintenance record when you save your changes.
Setup Time (Current and Revised)
The system displays the setup time for the item from the Kanban Process Maintenance record. If you change this number and click Save Kanban Data, the system updates that record with the value of Setup Time (Revised).
Cycle Time (Current and Revised)
The system displays the cycle time for the item from the Kanban Process Maintenance record. If you change this number and click Save Kanban Data, the system updates that record with the value of Cycle Time (Revised).
Yield (Current and Revised)
The system displays the item yield percentage from the Kanban Process Maintenance record. If you change this number and click Save Kanban Data, the system updates that record with the value of Yield (Revised).
Yielded Daily Demand Total
Display only. Calculated as:
Daily Demand (Revised) / Yield (Revised)
Cycle Time Total
The system displays the total cycle time for the quantity daily demand, calculated as:
Yielded Daily Demand Total * Cycle Time (Revised)
If you update either Daily Demand (Revised) in the sizing data grid or Cycle Time (Revised), the system updates Cycle Time Total.
Conversion Factor to Pitch UM
Display only. When the item unit of measure defined in Item Master Maintenance is not the same as the pitch UM specified in Kanban Process Maintenance, the system displays the conversion factor. If the units are the same, the field defaults to 1.0.