QAD 2017 Enterprise Edition > User Guides > Periodic Costing > Periodic Costing Calculation Logic > Calculation Cost Categories > Overhead
  
Overhead
The system adds the cost of the prior period from this element to the PO receipts occurring in the current period. The PO receipts should not be subcontract PO receipts. The system uses the value added to the PO receipt to calculate the unit cost of the item.