QAD 2017 Enterprise Edition > User Guides > Planning and Scheduling Workbenches > Master Scheduling Workbench (MSW) > Additional Workbenches Tabs > Intersite Demand Tab
  
Intersite Demand Tab
Use the fields in the Intersite Demand tab to view demand information from distribution requirements planning (DRP) intersite requests. DRP balances supply and demand for items transferred between sites. The transfer of demand from the site receiving the items (receiving or demand site) to the site supplying the items (shipping or supply site) is facilitated through the generation of intersite requests. DRP calculates distribution item requirements, generates intersite requests, and manages shipment schedules and transportation. Use the workbenches tab to review information to schedule items for the intersite demand.

Intersite Demand Tab
Item Number
The item number of the seasonal-demand order.
Source
The site that supplies the item when demand exists at the receiving site.
Site
The site the seasonal build applies to.
Req Nbr
The intersite request number.
Ship Date
The system uses ship dates set up in Shipping Schedule Maintenance, in coordination with receiving days and load, transit, and unload lead times defined in Transportation Network Maintenance, to calculate default ship dates for intersite requests. When a shipping schedule is not defined, the ship days from the transportation network are used instead.
Qty Open
The open quantity on the intersite request.
UM
The unit of measure for the item of the DRP intersite request.