Report
|
Description
|
|
WIP Status Inquiry (18.22.12)
|
Displays quantities in the input, output, and reject queues for an operation.
|
|
WIP Status Report (18.22.4.11)
|
Generates a report of WIP queue quantities for all operations in selected cumulative orders. The report also shows the cumulative activities affecting each of the queue quantities, such as cumulative completed, scrapped, adjusted, rejected, reworked and moved to next operation.
|
|
Operation Transaction Inquiry (18.22.4.1)
|
Displays repetitive operation history records.
|
|
Scrap Analysis Report (18.22.4.3)
|
Displays percentages scrapped by reason code over an interval of time compared to the quantity completed in that interval.
|
|
Reject Analysis Report (18.22.4.4)
|
Displays percentages rejected by reason code over an interval of time compared to the quantity completed in that interval.
|
|
Rework Analysis Report (18.22.4.5)
|
Displays percentages reworked by reason code over an interval of time compared to the quantity completed in that interval.
|
|
WIP Adjustments Analysis Reports (18.22.4.6)
|
Displays WIP adjustments over an interval of time.
|
|
Cumulative Order Cost Report (18.22.4.10)
|
Displays all data related to costing captured in the cumulative order when it is created. It reports by operation the product structure and component costs, labor hours per operation, labor cost per hour, burden factors, yield factor, subcontract cost, and the group of costs.
|
|
Operations Numbering Report (18.22.4.12)
|
Displays operation transaction history by number or date range. Transaction sequence numbers apply to the database as a whole; as a result, transactions within a domain may appear to have gaps. This report lets you see transactions created in all domains and verify that numbering is sequential.
|
|
WIP Valuation Report (18.22.4.13; 18.22.4.37 for enhanced .NET UI version)
|
Reports the value of the WIP queues at the operation costs contained in the selected cumulative orders. Either the cumulative order operation standard costs, the cumulative order average costs, or the current GL standard operation costs can be used for valuation. You have the option to display cost elements.
|
|
Scrap and WIP Adjustments Valuation Reports (18.22.4.14 and 18.22.4.15)
|
Reports the value of material scrapped/adjusted within an interval of time. The data can be sorted by either site and item or by descending value. Either the cumulative order operation standard costs, the cumulative order average costs, or the current GL standard operation costs can be used for valuation. You have the option to display cost elements.
|