QAD 2016 Enterprise Edition Training Guides > Shop Floor Control > Study Questions > Answers to Study Questions
  PPT
Answers to Study Questions
1 In QAD Enterprise Applications, Operation Scheduling starts scheduling at the last operation and, working back from the due date, assigns operation start and stop dates for each operation in the routing.
2 The Dispatch Report is a list of all work orders scheduled at or to arrive at a work center. The work orders are listed in ascending sequence (earliest start date first) by operation start date.
3 Examples of non-productive labor feedback are machine breakdown, waiting for work, repairing tools, cleaning, or meetings.
4 True.
5 False. The Move Next Operation field setting of Yes places the operation in queue (Q) status.
6 True.
7 True.
8 Yes, at least one.
9 No, holidays can be work center-specific.
10 Fewer GL transactions, easier to balance GL on work orders with long run times.