QAD 2017 Enterprise Edition > User Guides > Planning and Scheduling Workbenches > Production Scheduling Workbench (PSW)
  
Production Scheduling Workbench (PSW)
The following topics describe how to use the features of Production Scheduling Workbench (PSW).
Introduction
Introduces the PSW, components, and features.
Enabling PSW
Tells you how to enable PSW for a site.
Accessing PSW
Provides procedures to access the PSW in the .NET UI.
Set Up
Tells you how to synchronize tables, mass set up production lines, then mass update the setup.
PSW User Preferences
Describes user preferences for PSW, including field descriptions for all user preferences
Processing PSW Schedules
Provides a general procedure to create and process a production schedule and describes processing results.
Working with Sequence Grid Data
Describes various ways to manipulate dates, data, and other items within the PSW Sequence Grid.
Dispatching and Printing
Provides instructions to dispatch and print PSW-built schedules.