Unsequencing Production Orders
Occasionally, you may need to unsequence a production order, removing the sequence ID and replacing with an unsequenced status, that is, the sequence ID is 0 (zero).
You can do this by:
• Entering a 0 (zero) in the Seq field of the Sequence Grid
• Entering a 0 (zero) in the Seq field within the production order in Production Order Maintenance within PSW.
• Dragging a sequenced order and dropping it after an unsequenced order. The system changes the sequence to 0.
Note: Dragging/dropping after an unsequenced order only works when the order you are dragging is the only sequenced order or you drop that order between two unsequenced orders.