Advanced Repetitive > Simulating Schedules in the Workbench > Reviewing Line Schedules
  
Reviewing Line Schedules
Use Line Utilization Report (18.22.1.15) to review the results generated by the workbench. This report provides information for evaluating the load placed by a line schedule on a production line if it replaced the existing repetitive schedule. It also shows the changeover load between shifts, when appropriate.