Integrating QAD Data Warehouse Designer into an Existing Warehouse > The integrate process
  
The integrate process
The steps in the integrate process are:
1 Create a test environment (database user) with the existing data warehouse tables loaded.
2 Load a copy of the QAD metadata repository into this test environment. See the Installation and Administration Guide for instructions on how to load a metadata repository.
Working within the QAD Data Warehouse Designer tool proceed to:
3 Create any connections to UNIX or Windows servers where host scripts are currently executed. See either creating a Windows connection (see "Windows" on page 128) or creating a Unix connection (see "UNIX" on page 157).
4 Create a Data Warehouse connection mapping back to the test environment. See creating a connection to the data warehouse (see "Data Warehouse" on page 96).
5 Incorporate any Host system scripts currently used. See incorporating host scripts (see "Integrating, Host Scripts" on page 979).
6 Browse the Data Warehouse connection (Browse/Source Tables).
7 Drag and drop each existing data warehouse table into an appropriate object type. See Selecting an appropriate table type (see "Integrating, Selecting a Table Type" on page 981)
8 Answer the retrofit questions, and build any required procedures. See integrate questions (see "Integrating, Questions" on page 981).
9 Edit and amend all generated procedures, or create new procedures to handle the existing processing methodology. See procedure changes (see "Integrating, Procedures" on page 986).
10 Test the new environment.