Planning and Scheduling Workbenches Change Summary
  
Planning and Scheduling Workbenches Change Summary
The following table summarizes significant differences between this document and previous versions.
 
Date/Version
Description
Reference
March 2014 EE
Added new Authorized Receipts Delayed and Scheduled Receipts Delayed statuses for embedded CAC.
 
Added changes to reflect that the MSW Capacity Grid’s Required Capacity and Scheduled Quantity rows are based on capacity open quantity.
October 2013
Enhancement/Maintenance Release
Added new subsection on Personalization Architecture to the Overview.
 
Added new section on Create Process Performance to the Overview.
 
Added new capacity panel information for the Schedule Grid.
 
Added information on using Schedule Maintenance (18.2.1 and 18.22.2.1) when you enable the workbenches.
 
Changed the Production Line field description in and added new Update BOM/Routing field to Production Line Item Update program.
 
Added new fields to Workbench Control File, and added a section on setting controls in Workbench Control File to the MSW chapter. Previously, the control file was described in the EAM chapter and only included EAM-related fields,
and
 
Added new section on Selecting the Method for Date Calculations to user preferences description in the MSW chapter. Changed user preferences to reflect user preference updates.
 
Added information on viewing over-completed orders in the workbenches.
 
Updated information for the CAC Computation Method field.
 
Added information on data that displays in the Quantity Available to Allocate column, in the CAC Shortage Report.
September 2013.1 EE
Rebranded for September 2013.1 EE.
--
March 2013 EE
Rebranded for March 2013 EE.
--
 
Added new create process performance topic.
December 2012.1 EE Enhancement/Maintenance Release
Added a new quick-find function that lets you locate items and production order records on the MSW.
 
Added new functionality that makes forecast dynamically included in Supply/Demand Panel.
 
Added new Seasonal Build, Change Quantity by Month, Holidays, and Intersite Demand browses for the workbenches.
 
Added new CAC on-demand, dynamic processing for the MSW.
May 2010.1 through 2012 EE enhancement bundle
Added new co-/by-product chapter to the book.
 
Added new section for deleting/closing scheduled orders to MSW chapter.
 
Added new fields for CAC user preferences
 
Added new problem/solution information for closing E status co-/by-product orders to Troubleshooting appendix.
March 2012 EE Retrofit
Added a section to the Overview for Enterprise Asset Management (EAM) future functionality.
 
Added sentence regarding notification of background thread completion to Overview chapter.
 
Added a section to the MSW chapter to describe a the Product Structure Filter that helps schedulers gauge the impact of a schedule the change immediately across for all levels of the bill of material (BOM).
 
Restructured the Overview in the component availability check (CAC) chapter to better reflect workbench built-in CAC functionality
 
Added subsection to MSW chapter for functionality to change a firm order back to a planned order.
September 2011/2011.1 EE
Rebranded for QAD 2011.1 EE
--