QAD 2017 Enterprise Edition > User Guides > Periodic Costing > Periodic Costing Change Summary
  
Periodic Costing Change Summary
The following table summarizes significant differences between this document and previous versions.
 
Date/Version
Description
Reference
September 2017/2017 EE
Rebranded for 2017 EE
--
March 2016/2016 EE
Added information about using WAVG with unit cost elements less than zero.
 
Added information about the system transferring WIP from the last closed order to the next open order.
 
Added information regarding the PCCSTCOR transaction resolving negative costs.
 
Added information about avoiding number master record locking.
here and
 
Added new browses and reports to program list.
 
Added new customer consignment transaction information and added new Service and Support Module (SSM) transaction information to the Calculation chapter.
 
Added information about the Periodic Costing calculating the hour rate for burden or labor as negative.
 
Added information about the system including non-recoverable taxes associated with logistics expenses in the PC Unit Cost calculation.
 
Added information about scrap or rejected quantities.
 
Expanded co-/by-product processing and moved the data from the Overview to the Calculation chapter
 
Added information about Periodic Costing with fiscal receiving enabled and disabled.
 
Changed the name of the PC Discrete WO Bill Cost (30.5.15.7) report to PC WO Bill Cost.
 
Added enhancements to PC Inv Cost and Account Reconcile (30.5.17.10).
 
Added text to describe new PC Unit Cost Calculation report (30.5.17.17).
 
Added information about CHUI version of SF Movement report (30.5.19.4).
March 2015, version EE 2015
New user guide for 2015 EE with multiple chapters.
Separated as a single chapter from the QAD Costing User Guide in previous EE versions.
--