Material Variance & offsetting Method Variance on a Production Order Issue
Samantha Cesar, modified 1 Year ago.
Material Variance & offsetting Method Variance on a Production Order Issue
Post Date: 4/1/25 (Bronze, 3 Posts) Recent PostsThere was a mistake in the Product Structure for the attached Production Order so to correct it, |
1. all the material issued was unissued |
2. all the qty received to the Production Order was reversed |
Even with doing the above steps, the -155K of Favorable Material Variance is offset by 155K of Unfavorable Method Variance. Therefore, how do we zero out the -155K of Favorable Material Variance and 155K of Unfavorable Method Variance (we don’t want to do a manual journal entry, we want QAD do it for us automatically. In the past, when we have done #1 and 2 above, we have never had an issue) |
The steps that the Planner used were |
1. Unissued the material using Production Order Component Issue (16.5.12) |
2. Unreceived the qty put into inventory using Operation Activity Transaction (16.13.13). On each Operation Step, put the quantity completed as -500 |