Message Boards

ATP for multi-level BOM check.

thumbnail
Abdirizak Mohamed, modified 3 Years ago.

ATP for multi-level BOM check.

Post Date: 11/13/17 (Bronze, 5 Posts) Recent Posts

Hi everyone,

Can the ATP check drill down to the components?

Example ; when I place a sales order will ATP check available stock, If no Stock then if is there a production in process that has not been consumed if not then are raw materials available ?

Does QAD ATP check has this detailed level of check ?

If not can it be configured?

Please Help!

Thank you

thumbnail
Phill Norrey, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 11/13/17 (Yoda, 1010 Posts) Recent Posts
No.  ATP is a single level drilldown.  You are basically looking at a mini MRP run every time to do what you say.
thumbnail
Abdirizak Mohamed, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 11/13/17 (Bronze, 5 Posts) Recent Posts

Thank you so much Phil for looking into this.

So basically if I understand what you are saying is there is no way anyone can customize to do what I explain above ?

thumbnail
Phill Norrey, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 11/15/17 (Yoda, 1010 Posts) Recent Posts

No.  I could probably be written as a customization but depending upon the size of your BOM's could also be very slow.  Basically it would first need to check what you are short of at the first level.  Say you need 100, but you only have 60 available and no work orders.  Then it would need to blow down one level and check each component.  For any not having enough to build the 40 short it would need to then repeat the above process.  Also what happens if one of the sub components is used on multiple items you could be taking materials thinking thay are available when in reality they are not.

Basically you need like a version of 13.8.17 and then for each item where there is a shortage you repeat 13.8.17

thumbnail
Raymond Chin Kwie Joe, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 11/23/17 (Rhodium, 825 Posts) Recent Posts
What you want is in fact covered by MRP as is described. However, it is possible that you want to check your components the moment you enter the order. Try menu 3.8.17 or 3.8.16. I think these menus will satisfy your information need.
Brent Shooltz, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 2/14/18 (Silver, 58 Posts) Recent Posts

The new version of MSW/PSW, delivered with the Production Orders Module, will provide new functionality called, BOM Projected Quantity On Hand.  This feature in the MSW provides the ability to enter a theoretical scheduled QTY and then view the BOM PQOH impact for all levels above or below the scheduled item.  

Example: I enter a scheduled QTY for a finished item - I can view the BOM PQOH for all levels of the BOM to view where I have purchased and manufactured component shortages.  Based on where the PQOH shortage is resolved, will represent my ATP date. 

 

Brent

thumbnail
Abdirizak Mohamed, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 2/14/18 (Bronze, 5 Posts) Recent Posts

Brent Thank you so much!

thumbnail
Raymond Chin Kwie Joe, modified 8 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 2/14/18 (Rhodium, 825 Posts) Recent Posts
This is great! I do not have the experience with the new production order scheduling but this is great. Thanks for sharing the information.
Chris Davis, modified 7 Years ago.

Re: ATP for multi-level BOM check.

Post Date: 12/16/18 (Bronze, 2 Posts) Recent Posts

Hi,

Interested to see if you suceeded with this as we are currently reviewing it.  We need multi-level ATP at the time of sales order entry,  has anyone achieved this with standard QAD and/or add-on solutions ?

Many thanks,

 

Chris

Message place holder