In Routing Maintenance (Rate Based) I have noticed an issue with start date

David Langschied, modified 3 Years ago.

In Routing Maintenance (Rate Based) I have noticed an issue with start date

Post Date: 10/4/21 (Silver, 61 Posts) Recent Posts

When I first enter the routing info, I can see the start date at the top and at the mid left bottom portion of frame a.  I also see the end date in bother locations.  When a get to the editable screen, the dates get blanked out.  This is standard QAD code.  It also only occurs in NetUI, CHUi is fine.

John Ruch, modified 4 Years ago.

Re: In Routing Maintenance (Rate Based) I have noticed an issue with start

Post Date: 10/12/21 (Silver, 64 Posts) Recent Posts

Is it possible someone created a simplified screen that blocks editing of these fields? 

Amanda Rose, modified 2 Years ago.

RE: In Routing Maintenance (Rate Based) I have noticed an issue with start

Post Date: 9/2/23 (Silver, 51 Posts) Recent Posts
No.  We have no configured screen for either Routing Maintenance or Routing Manitenance (Rate-Based) and I can also never edit the end-date, even in Terminal mode
thumbnail
Phill Norrey, modified 2 Years ago.

RE: In Routing Maintenance (Rate Based) I have noticed an issue with start

Post Date: 9/8/23 (Yoda, 1010 Posts) Recent Posts
When you say you can never edit the end date are you talking about in the first screen or the second?  You cannot change it in the first screen as it is part of the key to the file.  Same as you cannot change the start date in the first screen, if you do you actually create a new record.  That is why they are both in the second frame.  If you change them in here it updates the key to the record to reflect the new dates
David Langschied, modified 2 Years ago.

RE: In Routing Maintenance (Rate Based) I have noticed an issue with start

Post Date: 9/10/23 (Silver, 61 Posts) Recent Posts
This is an old issue for me.  I opened this a long time ago.
Where my struggle was that I could not force the user (batch in this case) out of the screen because the data was not correct.
I do not have access to the code (encrypted), so I setup a procedural trigger to validate the date first, then apply.
The validate worked, but the program continued.  I was told that there was no way to abort a program from a procedural trigger.
I have had other instances where this has come up.  I wish there was a way to add validation to QAD maintenance field entries when the code is not available to be modified.

Does anyone have suggestions?